Loading…
Loading…
203 results • Recent activity
CONSTRUCTION OF PIPE FALL STRUCTURE AT CH. 5.00 AND SILT CLEARANCE IN BETWEEN CH. 1.00 CH. 93.00 OF MINOR-158.30 OF KMC(L) AT MOUZA-SALDAHARA THREE OTHERS, BLOCK- SARENGA
Closing cuts and removing deposited earth from Canal bed in-between Ch. 0.00 Ch. 60.00 and C.C. lining in between Ch. 20.00 Ch. 30.00 of Dy. No.-18 of MBC at Mouza-Janglekhas, Block-Binpur-1
Flood protection and mitigation work of River bank erosion for a length of 180.00 m. of Silabati River (left embktt.) for reducing vulnerability of people within Mouza- Kalapat, G.P- Manikkundu, Block- Chandrakona- I
Flood protection and mitigation work of River bank errosion for a length of 150.00 m. of Silabati River (left embktt.) for reducing vulnerability of people within Mouza- Banka Sultanpur, G.P- Manikkundu, Block- Chandrakona-I
M/R to Dy. No-2 in between Ch.0.00 Ch.204.00 of Garhbeta Branch Canal (G.B.C.) under K.C. Sub-Division No.-II
F.P.M. to the Ex- Zamindari Embankments of river Silaboti under Manikkundu G.P of Chandrokona- I Block during Monsoon 2026 under K.C. Sub Division No.- VII