Loading…
Loading…
203 results • Recent activity
F.P.M. to the Ex- Zamindari Embankments of river Silaboti under Manikkundu G.P of Chandrokona- I Block during Monsoon 2026 under K.C. Sub Division No.- VII
Flood protection and mitigation work of River bank errosion for a length of 250.00 m. of Kethia River (left embktt.) for reducing vulnerability of people within Mouza- Beraberia, G.P- Manoharpur- I, Block - Chandrakona- I
Restoration of canal bank by closing ghoge at Ch46.00RBank and M/R to Inspection Path in between ch. 0.00 ch. 56.00 at RBank of KMCL at Mouza-Pirargari Khamani, Block- Sarenga
Strengthening of Ex-Zamindary embankment (Right Bank) of River Kana Shilabati for a length of 90.0 metre at Mouza- Ghoshkira , G.P. Bhagabantapur-I, Block- Chandrakona-II
Flood protection and mitigation work of River bank errosion for a length of 220.00 m. of Silabati River (left embktt.) for reducing vulnerability of people within Mouza- Hiradharpur, G.P- Manoharpur- I, Block- Chandrakona- I
F.P.M. to the Ex- Zamindari Embankments of river Silaboti under Bhagabantapur-I II G.P of Chandrokona- II Block during Monsoon 2026