Loading…
Loading…
203 results • Recent activity
Removal of deposited earth from canal bed including repair and restoration of canal bank in between Ch. 50.00 to Ch. 103.00 of Dy-8AL of TSMC(N) under K.C. Sub-Division No. XIII of Kangsabati Canals Division No. V, Jhargram.
Field survey work in connection with Dredging /De-silting/Removal of river bed materials Tarasia (Buriganga ) khal from Sarai to Kanpur for a length of 10.00 km in Block- Keshpur , PS- Keshpur and Dist- Paschim Medinipur under No Cost to State
Field survey work in connection with Dredging /De-silting/Removal of river bed materials of Ratnakar Khal from Saljhati to Mulgram for a length of 7.20 km in Block- Ghatal Chandrakona - I, PS- Ghatal ,Chandrakona ,and Dist- Paschim Medinipur
Field survey work in connection with Dredging /De-silting/Removal of river bed materials of Beharichak Khal from Balitora to Beharichak for a length of 5 km in Block- Daspur- I, PS- Daspur , Dist- Paschim Medinipur under No Cost to State Exchequer
Field survey work in connection with Dredging /De-silting/Removal of river bed materials from Khirai Khal from Palta to Gotpata for a length of 29.50km in Block- Kharagpur-II , Debra Panskura - I , PS- Kharagpur Local, Debra Panskura and Dist- P
Field Survey Work in connection with Dredging /De-silting/ Removal of river bed materials Parang River from Kutbi Chak to Khirish Mul for a length of 8.40km. In Block - Keshpur, P.S-Keshpur and Dist. Paschim Medinipur under No Cost to State