Loading…
Loading…
203 results • Recent activity
Field Survey Work in connection with Dredging Desilting Removal of river bed materials from Katan Khal from Hijli to Panna for a length of 16.2 Km in Block PS Ghatal and Dist Paschim Medinipur under No cost to State Exchequer basis.
Field Survey Work in connection with Dredging/ Desiting/ Removal of river bed materials from Shilabati River from Ramdebpur to Simana for a length of 14.100 Km in Block Daspur-I PS - Daspur and Dist- Paschim Medinipur under No cost to State
Irrigation Precautionary Measure for Salboni Branch Canal from Ch.00.00 to Ch.400.00 in connection with Kharif Irrigation 2026(1st, 2nd and 3rd watering) under Tilaghagri Section of K.C. Sub-Division No.-I, Salboni, Paschim Medinipur.
Irrigation Precautionary Measure for Goaltore Branch Canal from Ch.00.00 to Ch.600.00 in connection with Kharif Irrigation 2026(1st, 2nd and 3rd watering) under Goaltore Section of K.C. Sub-Division No.-I, Salboni, Paschim Medinipur.
M/R to DY No-6 of Goaltore Branch Canal (Glt.B.C.) in between Ch.0.00 to Ch. 76.00 under Goaltore Section of K.C. sub Division No. I under K.C. Division No.-I, Amlagora, Paschim Medinipur during 2025-26.
Flood Protection and mitigation Work of Embankment by closing breach for a length of 270.0 m of river Kethia (Right bank) for reducing vulnerability of people near land of Dhananjoy Shaw(Reach-I, 70.0m) , Ashok Shaw (Reach-II, 90.0m), Ananda Ghosh