Loading…
Loading…
48 results • Recent activity
Rejuvenation from Downstream of Bundpalam in Kannur corporation.
GENERAL-CSIND-Survey and Demarcation of West Cost Canal from chainage.375.02Km To chainage.377.52 Km for a length of 2.5Km in Malappuram District for developing in to NW-3 Standards-Topographical Survey Work
GENERAL Thazhepotty Reach II Side protection wall on left bank of Chaliyar River at upstream of Jalanidhi well Thazhepotty in Pothukallu GP of Nilambur LAC in Malappuram DT General Civil Work Retender
side protection work
Auction of Dredged spoil collected from the work FC-River course correction work by dredging Korappuzha River from Railway Bridge at Ch 418.32 KM to Korappuzha River mouth in KoyilandyTaluk
Urgent reformation of sea wall for 360 m towards north from 70 m south of CP 1914 construction of return wall for 20 m and construction of new seawall for 310 m with 1.20 m depth of earth work excavation in between CP 1911 and 1914