Loading…
Loading…
210 results • Recent activity
Annual maintenance of Main canal
PVIP-Removal of blockage,slipped earth and engaging wood cutters for LLC
The items of the estimate are Clearing jungle, Earthwork for side lowering,foundation and desilting, Concrete CC 148 for foundation levelling course, Concrete CC 124 for foundation and superstructure of side wall, filling with contractor own ea
The following provisions are included in this estimate clearing grass, cutting stumps, earthwork excavation, dismantling DR, 136 concrete for side wall and bed,136, 9 mm plastering for side wall and bed.The reusable rubble obtainted from
The items included in this estimate are Clearing grass, Bailing out water, demolishing cement condemolishing stone rubble masonry, Earth work excavation for desilting, lining CC 1 3 6 for Bed and side lining, sluic chamber, parapet wall near
In this estimate provisions included are Earth work excavation , 136 concrete for side wall, lining , 9 mm plastering.