Loading…
Loading…
205 results • Recent activity
GENERAL-PVIP-Action Plan 2025-2026 Urgent Rectification Works-to Aryampadam MD between ch.1/300km and 1/332km-General Civil Work
Urgent Rectification Works-to Kodanad west Branch Canal between ch.5/990 and 6/007 and reconstruction of Pallothumali FC head wall at ch.6/00km of Kodanad west branch canal General Civil Work
Rectification works to prevent leakage from syphon and UT between ch.700m and ch.820m and prevent overflow between ch.250m and ch.300m of Kizhakkambalam Major Distributory-General Civil Work
PVIP-Reconstruction of Right Side protection wall between ch.415m and 505m of Njavaripadam MD-General Civil Work-1
GENERAL-BREACH-Urgent rectification works to the breach formed at Right bund of Valakam Branch canal at CH 4000m for the year 2025-26-General Civil Work
Urgent Rectification Works-to the left side damaged lining of Low level canal between c 18/375km and lining between ch 1/425km and 1/450km of Rayamangalam MD and Re construction of sluice head wall