Loading…
Loading…
213 results • Recent activity
Reconstruction/Construction of R/Wall, B/Wall at various spots/ Construction of Gabion Walls at various locations including Cost of Gabions from and Construction of PCC Drain from Km 0 to Km 40 550 in Sub Division 1st, 2nd and 3rd on Shopian Side
Removal of slips slides surcharge De-silting of Culverts Restoration of damaged berms clearance of drains and cloud burst at various spots , clearance of deposited mulba from choked culverts etc. Buffliaz side Km 0 000 to 43 600.
Construction of Rigid Pavement from CH 32.600 to 32.700, 37.500 to 37.650, 38.590 to 38.990, 40.120 to 40.250, 40.900, 41.050 to 41.450 on Mughal Road Buffliaz Side.
Construction of Diversion at Avalanche Prone Stretch at KM 30 800 in sub Division 2nd of Mughal Road Shopian Side
Construction of CD Works At Km 1 800, At Km 16 050, At Km 23 800, At Km 25 500, At Km 27 000, At Km 31 500, Construction of Parapets at various Spots from Km 0 to Km 40 500 and Construction of Passenger Sheds various spots
Supply and Fixing of Road Signs (IRC 67-2012), Fixing of RD Stones and Supply and Fixing of New informatory Boards at various locations from km 0 000 to 40 550 in sub division 1st, 2nd and 3rd on Mughal Road Shopian Side