Loading…
Loading…
110 results • Recent activity
SH. GSB, WBM nd PMC etc
Patch grouting,patch metaling,BC,Pucca drain from Ch. 2.80 km to 5.40 km
Retro-reflective edgle line marking,road studs etc. from Ch. 0.00 km to 9.00 km
Hiring of Mahindra and Mahindra, Bolero having Commercial registration (model not earlier than 2023) for site inspection and official routine duty.
Mtc. of road starting from NH-08 at Jawharnagar (Near BSF Camp) to Babukumar (Length -9.20 Km) during the year 2025-2026/ SH- Constn. of R.C.C Retaining Wall at Ch. 4.79 Km(L/S), 7.13 Km(L/S) and 7.28 Km(L/S).
Maintenance of road from KMA road to Balaram Daspara via Balaram H.S. School (L- 2.70 KM)/ SH- Construction of RCC railing and Construction of Wing wall by CC Blocks etc.