Loading…
Loading…
222 results • Recent activity
Replacement of existing Hume pipe culvert by RCC Cross Drainage structure 2.00x2.50m on the road Bhallukcherra to Damcherra at CH.11.00 KM under Damcherra Sub Division, PWD R and B during the year 2025 to 2026 SH Box Culvert, Return Wall,WBM etc.
Earth filling, Protection work, RCC drain, GSB, WBM II and III, PMC and seal coat
Mtc of road from Jalabassa to Bhandarima from Ch. 28.211 Km to 41.50 Km (Total Length- 13.289 Km) under Dasda R.D. Block during the year 2025-2026/SH- WBM-3, Re-carpeting, Seal coat etc. from Ch. 28.211 km to Ch. 34.211 km.
Patch repairing by metaling grouting patch carpeting and sand seal coat etc during the year 2025-26.
Patch Carpeting, Patch WBM n Grouting, Protection Work, Surface Drains, Stripping etc.
Recarpeting and patch carpeting patch WBM n grouting stone seal coat surface drain stripping protection works etc