Loading…
Loading…
213 results • Recent activity
Patch WBM, patch grouting, patch carpeting and thorough seal coat and protection works etc.
Maintenance of road from TD road to Halam Basti from CH.1.00 KM to CH.2.42 KM Total Length 1.42KM under Damcherra Sub Division, PWD R and B during the year 2025 2026 SH Patch metalling, Patch Carpeting, Seal coating, Pucca Drain, Surface Drain etc
PR of PMGSY road from Rabindranagar to Bhuyacherra (Link No- L050 Length-2.288 Km) under Jumpui Hill Sub-Division during the year 2025-26SH--WBM-3 carpeting seal coating road side pucca etc.
Vertical extension of Administrative Building for Computer Lab in Ramkrishna Mahavidyalaya, Kailashahar SH Building portion including Internal water supply, Sanitary Installation, Sewage Drainage works1st floor Part.
PR of Premtala-LaljuriPetrol Pump road to Hemsukla Ch-0.00 km to Ch-1.29 km Length-1.29 km under Jampui Hill Sub-Division PWD RnB during the year 2025-2026/SH-- Repair pot holes Tack coat carpeting seal coat etc.Gr-I
Maintenance of road Kailashahar Murticherra road to Manuvalley TE via Hidly village L 1.8Km SH Metalling, carpeting , seal coating, RSD etc. complete during the year 2025 26.