Loading…
Loading…
356 results • Recent activity
Mtc of Road from mora chowmuhani to NIT road under Jirania Sub- Division PWD (R and B) during the year 2024-2025(L 3.20km) SH Grouting, Patch-carpetting, seal coat etc.(L 3.20km, from Ch.3000.00 mtr to ch.6200.00mtr)(2nd Call).
Mtc of road from Gurupada Colony to Guru para (Kwtwi para) (Total road length 2.286 km) under Khumulwng Sub-Division PWD(R and B) during the year 2025-26 SH Patch WBM-3, patch Grouting, Patch Carpetting, Sand seal coat, stripping excess soil..
SH GSB WBM2 WBM3 Carpeting Construction of Pucca drain RCC Covered Drain Box culvert Retaining wall and allied works at different stretches
Mtc of road from Chakbasta TSR camp to Daspara PWD road via Borakha colony road during the year 2025-26 SH Grouting, patch carpetting, road side pucca drain and other allied works (L 1.20 Km, Ch 0.00 Km to 1.20 Km).
SH patch Metalling grouting recarpetting and aliied works
SH Earth filling GSB Paver Block