Loading
Loading…
Loading…
186 results • Recent activity
Partially load bearing with 254mm thick brick wall in superstructure stiffened with brick pillar and RCC roof slab.
SH-WBM-III, Repairs to road by Potholes repair, Re-carpeting etc. during the year 2025-26.
WBM, Patch repairing, Patch Carpetting and alied works.
Protection Wall cum Breast wall and allied works etc .(Gr.I).
SH- Repairs of pot holes, WBM-3, Carpeting, Re carpeting etc during the year 2025-26.
Patch Grouting, Patch metaling, Re-carpeting, Seal coat, construction of drains etc. (Gr-II).