Loading…
Loading…
246 results • Recent activity
Protection Wall
1 Year Running contract work
Additional BM patches and BC overlay for entire width for 5040 m are proposed in this estimate. As traffic safety measures, provision for road marking with thermoplastic paint, fixing road studs for smooth drive in night hours, fixing reflective
This estimate includes the provision for Supply 36mm broken stone pothole filling with 36mm broken stone GSB WMM Tack coat CGPC instant pothole filling with shelmac routine inspection Engaging coolie for petty work excavator bailing out wate
This estimate includes the provision for Supply 36mm broken stone pothole filling with 36mm broken stone GSB WMM Tack coat CGPC instant pothole filling with shelmac routine inspection Engaging coolie for petty work , excavator bailing out water
Reconstruction of Culvert at Vallakkadavu under Kumily Section In Peermade Constituency-RCC Culvert Construction at Ch. 6/400 of Vandiperiyar Gavi Moozhiyar Road