Loading…
Loading…
252 results • Recent activity
GENERAL-RM / 2025-26 - RC 2 Phase 1 / Zone VI --For various PWD roads under Roads Section Thodupuzha in Idukki district- 2 road stretches for a length of 11.65 Km
This estimate includes the following Appendix 1 covers earthwork excavation GSB WMM SS RS BM BC Thermoplastic compound delineators reflective studs OHM Signboards and Crash Barriers. Appendix 2 covers Earthwork excavation PCC RCC M20 PCC M15
Items included are strengthening the road at necessary places, Providing BM and BC, traffic safety measures . Provision for Interlocking tiles for a length of 400m. provision for drain,culverts,side tiles, and irish concrete also included
initial rectification of the road stretches,Pre-monsoon works,pot hole filling with ready mix,maintenance of shoulders, prevention of water logging ,Emergency Works
BM and BC with 4.5 m avg. width, widening and strenthening with GSB and WMM, prime coat and tack coat, BM and BC,Drain works , irish drain , Retaining wall works,culvert reconstruction work , Interlocking Paveer block traffic safety works
dismantling old culvert earthwork excavation 136 concrete M15 concrete for drain M25 concrete for culver steel reinforcements GSB and interlock for culvert approach portion etc LHS drain is proposed with M15 while RHS drain is proposed with