Loading…
Loading…
99 results • Recent activity
G E N E R A L M a n g a l a m P r o j e c t D i s t r i c t Panchayath Deposit work 2025 26 Canal cleaning in distributaries and cada canals under CS VDY
Canal Bund Land Slide 2024 25 Mangalam Project CS VDY Slided Earth removal from Ch 0 640 Km to Ch 1 000 Km of Cheenikode field channel offtake from RBMC Ch 20 410 Km
This estimate is prepared for the maintenance works to quarters in Nemmara Camp area
The work is proposed for the Annual maintenance works to E-type quarters in pothundy camp area.
The work is proposed for clearing the vegetation on the upstream and downstream faces of earthen dam body and also on the sides of dam top road and approach roads.
The work is proposed for cleaning the field bothies in LB main canal and all its branches