Loading…
Loading…
78 results • Recent activity
Construction of Super Passage at CH 2 530 m on Left Bank Canal of Aruna medium Project.
CONSTRUCTION OF APPROACH ROAD FROM MAIN AND LEFT BANK CANAL OF ARUNA MEDIUM IRRIGATION PROJECT TO MAIN ROAD TAL VAIBHAVWADI DIST DIST SINDHUDURG
Providing and fixing roadside railing for steep slope at Mangvali titha kusur kumbharwadi Rehabilatation Gaothan of Aruna Medium Irrigation Project
Construction of balance works of Fringeway Road and Structhers of Het to Nagapwadi CH 0 000 TO 4 900 M including black topping and Construction of WBM and Black topping of Road from Right bank Fringe way road dam top Left Bank Diversion Road of Arun
Construction of Protection Wall from Patadeshwar Temple to Terwanmedhe Pickup Weir to prevent river water from entering during Monsoon season
Construction of protection wall along the riverbed to prevent damage to the farm of Umesh Gopal Pangam in Ghodagewadi area