Loading…
Loading…
7 results • Recent activity
Implementation of CMS
Turnkey work of PPS-III and PPS-IV with Supply and ETC of 5x250 MVA, 33/400 KV transformers, construction of three nos. bays of 400 KV transmission lines for PPS-III at village Bandarewala, supply and ETC of 4x250 MVA, 33/400 KV transformers along wi
HIRING OF 03 NOS. FOUR WHEEL DRIVE AC VEHICLE (MODEL 2022 OR LATEST) IN BIKANER, FALAUDI , JAISALMER DISTRICT AND 01 NOS. SCORPIO/ BOLERO/ EQUIVALENT TO IT AC VEHICLE (MODEL 2022 OR LATEST) IN BIKANER FOR SITE SUPERVISION DEVELOPMENT OF SOLAR PARKS
Work of Software Modelling, Customization, Engineering, Configuration of existing Operator Training Simulator at KSTPS Kota including Integration of Operator Training Simulator compatible to 2x660 MW SSCTPP Suratgarh Unit with Factory Acceptance Test
Centralized Biennial Rate Contract for Inspection of GERB Make Vibration Isolation System at various RRVUNL Power Stations through Single Source Proprietary System from OEM i.e. GERB Vibration Control System Pvt. Ltd., Bengaluru as per scope of work
Construction of 4x250 MVA, 33/400 KV X-mers, Bays for Four Nos 400 KV TL for PPS-I alongwith 400 KV, 1x125 MVAR, Shunt Reactor (Bus Type) and 4x250 MVA, 33/400 KV X-mers, Bays For Three nos 400 KV TL for PPS-II at Village Ramsar Chhota,Pugal, Bikaner