Loading
Loading…
Loading…
93 results • Recent activity
Reconstruction
waterproofing
flood inflow
Construction of Cement Concrete Lining work to Mangaon branch canal between ch.0/000 to ch.26/800 m, Morba branch canal between ch.0/000 to ch.15/150 m, Ashtami branch canal between ch.23/000 to ch.28/000 m under Kundalika Left bank canal, Also Recon
Canal Lining work ch. 0/000 to 9/880, Construction of Supper Passage structure at Ch. 5/050, 6/580, 6/730, 6/879, 7/620, 8/892. 9/516 and Recostruction of HPD drain wall at Kundalika Left Bank Canal Ta. Roha Dist Raigad. Under Maharastra Irrigation
REPAIRING POWERHOUSE TO NARALIBAG SERVICE ROAD.