Loading…
Loading…
986 results • Recent activity
Transformer 5000KVA, 33kV/11kV, Transformer 4000KVA, 33kV/11kV, Transformer, 3000KVA, 33kV/11kV, Transformer, 3000KVA, 33kV/3.3kV, Transformer, 2500KVA, 33kV/3.4 KV, Transformer, 2000KVA, 33kV/3.3kV, Transformer, 1000KVA, 33kV/3.4 kV, Transformer, 1000KVA, 6.6kV/3.3kV, Transformer, 500KVA, 33kV/3.3kV, Transformer, 630KVA 3.3kV/440V, Transformer, 500KVA, 3.3kV/550V- 415V, Transformer, 100KVA, 3.3kV/230V (L-L), Transformer, 25KVA, 6.6kV/230V (L-L), Transformer, 25KVA, 3.3kV/230V (L-L)
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2), Split Air Conditioner (Floor Type), as per IS: 1391 (part 2) (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6976902 Dated : 16-01-2026 Bid Document 1/13 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Split Air Conditioner Including Green AC, Wall Mount Type (V2) Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 1276494.56 Evaluation Method Item wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India Schedule 1 EMD Amount (In INR) 4000 Schedule 2 EMD Amount (In INR) 20000 Schedule 3 EMD Amount (In INR) 3000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 4 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. 2/13 (b). The EMD Amount will be applicable for each schedule/group selected during Bid creation. (c)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : SECL, DIPKA AREA SECL DIPKA AREA, AREA GM OFFICE, MATERIALS MANAGEMENT WING, KORBA DISTRICT, CHATTISGARH- 495452 (Secl Dipka Area)
INPUT SHAFT OIL SEAL-COUPLING SIDE, LOOP TAKE UP TROLLEY, INPUT SHAFT BUSHING, INPUT SHAFT OIL SEAL - HOLD BACK SIDE, 2nd STAGE BUSHING, OUTPUT SHAFT BUSHING, PLUMMER BLOCK WITH BUSHING FOR DRIVE DRUM, PLUMMER BLOCK WITH BUSHING FOR SNUB DRUM, PLUMMER BLOCK WITH BUSHING FOR DEFLECTOR DRUM, PLUMMER BLOCK WITH BUSHING FOR TAIL DRUM, PLUMMER BLOCK WITH BUSHING FOR TAKE UP DRUM, PLUMMER BLOCK WITH BUSHING FOR BEND DRUM, INPUT BEARING COVER SPACER RING, INPUT SHAFT WITH INTEGRATED PINION AND 1st STAGE GEAR, 2nd STAGE BEARING COVER, 2nd STAGE BEARING COVER -1st STAGE INTERMEDIATE SHAFT, 2nd STAGE SPACING WASHER -1st SATAGE INTERMEDIATE SHAFT, 2nd STAGE PINION SHAFT and GEAR -IN SET, 3rd STAGE BEARING COVER -2nd INTERMEDIATE SHAFT BEARING COVER, 3rd STAGE BUSHING -2nd STAGE INTRMEDIATE SHAFT BUSHING, 3RD STAGE PINION and GEAR -IN SET, BREATHER, EQUALIZING GEAR -IN SET, HAND OPERATED WINCH -LH and RH- IN SET, DRAIN PLUG, OIL LEVEL INDICATOR, COMPLETE TANDEM DRIVEN DRUM 650MM DIA ASSEMBLY, INPUT SHAFT OIL SEAL - COUPLING SIDE, INTERMEDIATE SHAFT, 3rd STAGE PINION AND GEAR, EQUALIZING GEAR IN SET -2 NOS., PLUMBER BLOCK WITH BUSHING FOR DISCHARGE DRUM, 2nd STAGE PINION and GEAR -IN SET, OUTPUT SHAFT OIL SEAL, FOOT MOUNTED HELICAL GEAR BOX WITH 3 STAGE, COMPLETE TANDEM DRIVE DRUM 650MM DIA ASSEMBLY, INPUT SHAFT-HOLD BACK COVER, HOLD BACK-END CAP, INPUT SHAFT BEARING CAP, INPUT BEARING COVER SPACING RING, INPUT SHAFT WITH INTIGRATED PINION AND 1st STAGE GEAR, 1st STAGE INTERMEDIATE SHAFT, 1st STAGE INTERMEDIATE SHAFT BEARING COVER, 1st STAGE INTERMIDIATE SHAFT BEARING COVER SPACING RING, 1st STAGE INTERMEDIATE SHAFT BUSHING, 1st STAGE INTERMEDIATE SHAFT SPACING WASHER, 2nd INTERMEDIATE SHAFT BEARING COVER, 2nd STAGE INTERMEDIATE SHAFT BUSHING, 2nd STAGE INTERMEDIATE SHAFT, 2nd STAGE INTERMEDIATE SHAFT SPACING WASHER, 3rd STAGE PINION and GEAR -IN SET, OUTPUT SHAFT BEARING COVER, OUTPUT SHAFT BEARING CAP, OUTPUT SHAFT, OUTPUT SHAFT SPACING WASHER, GEARED COUPLING -MECHANICAL COUPLING, EQUALIZING GEAR GUARD, INPUT SHAFT OIL SEAL-HOLD BACK SIDE, 1ST STAGE INTERMEDIATE SHAFT BUSHING, EQUALIZING GEAR SET, HOLD BACK
DISCHARGE DRUM G-09-12, COMPLETE TAIL DRUM ASSEMBLY G-11-12 R, COMPLETE SNUB DRUM ASSEMBLY G-21-10 R, COMPLETE TAKE UP DRUM ASSEMBLY G-15-10 R, COMPLETE TAIL DRUM ASSEMBLY G-11-10 R
Personal Fall Arrest System- Full Body Harness Conforming to IS 3521 (Part 1) (Q3)
Facility Management Services - LumpSum Based - Day to Day upkeeping, cleaning of 36no Bio Toilet in different locations/Sub Area Under AHQ of Johila Area; Day to Day upkeeping, cleaning of 36no Bio Toilet in different locations Sub Area Under AHQ..