Loading…
Loading…
18 results • Recent activity
Improvement of stormwater drainage capacity by providing 400 mm and 450 mm diameter NP3 RCC SS pipes including appurtenance structures and ancillary works within Zone-6 of Calcutta Leather Complex on turnkey basis under Sector-VI ITA.
Improvement of stormwater drainage capacity by providing 400 mm and 500 mm diameter NP3 RCC SS pipes including appurtenance structures and ancillary works within Zone-3 and 4 of Calcutta Leather Complex on turnkey basis under Sector-VI ITA
Design and Construction (Civil Works) Raw Water Intake Jetty on RCC piles including Jetty...... Industrial Township Authority under Amrut2.0
Restoration of severely Damaged Arterial Road in Tannery Zone within Calcutta Leather Complex, Bantala, Under Sector-VI Industrial Township Authority, under State Fund .
Cleaning of old existing strom Water and ETS drainage network and allied works for one year at calcutta Leather Complex, Bantala. Under Sector VI Industrial Township Authority.
Dismantling, lifting, Complete repairing and overhauling, Re-installation....ump-Motor set at EPS-4 and 7 at CLC area under Sector-VI ITA.