Loading…
Loading…
492 results • Recent activity
SHAVISON General Purpose Battery Charger suitable for charging, SHAVISON General Purpose Battery Charger suitable for charging Tubular Lead acid / VRLA/SMF/ Flat Plate Lead-Acid battery
Abrasion/Rub Tester
Endless Power transmission belt 2470X50, Timing Belt 2100 X 14 X 40 mm, Weighing belt BB200 AA415 Conveyor Belt, Round belt 6mmX2480, MOC- PU, Timing belt 30 T10 920, MOC- PU, Flat belt 1750X350, MOC- TPU, Flat belt 1560X350, MOC- TPU, Belt FHP 2130, Ruflex V Belt 3L270, GATES, Polyurethane belt 7M500, GATES, UMC round belt, 3mm dia elastic 362mm, Vertical mvemnt teeth belt, 720 8MGT3 20, Horizontal movement teeth belt, 475 5GT3 25, Conveyor belt, L - 400 mm, W-100, No. of, Conveyor Belt 20160 X 150 X 2mm, Conveyor Belt 15980 X 150 X 2mm, Conveyor Belt 9780X150X2mm Material PVC, Conveyor Belt 4740 X 150 X 2mm, Inclined conveyor 2040X150, MOC- TPVC, Flat belt 730X155, MOC- TPU, Inclined conveyor 4280X395X3.5mm, Scan Flat weighing belt, 1140X400X2mm, Scan big bag rejection, 1990X400X2mm, Small pouch rejection motor to pulley, 430X10
Custom Bid for Services - Descaling of Compressors Similar Category Operation And Maintenance Of Gas Compressor Station
Hydrochloric Acid (V3) Conforming to IS 265 (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6844877 Dated : 09-12-2025 Bid Document 1/9, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Procurement of Argon gas cylinders