Loading…
Loading…
113 results • Recent activity
kent Water Purification System upto 50 LPH flow rate
CRC Rust Remover Solution, Size 500 mL in Spray bottle
Hydrochloric Acid (V3) Conforming to IS 265 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2026/B/7105213 Dated : 27-01-2026 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Replacement UV Lamp for Mettler Toledo make TOC Analyzer, Kit, Replacement Inlet Filter 5000TOC for Mettler Toledo make TOC Analyzer
PRINTIING AND HARD BINDING OF REGISTER
TRISHNA CoB (Fabrication of 10- layer PCB of size 122mm x 56.05mm with critical clearances 0.1mm)