Loading…
Loading…
633 results • Recent activity
Thorough repairing, overhauling including replacement of defective spare parts of 1 no. incomer and 2 nos. outgoing H.T. OCB (6.6 kv /800 amp) at Ultadanga Drainage Pumping Station.
Overhauling and replacement of damage carbon brush, holder and slip-ring terminal including other allied electrical works of pump unit E at Dhapa lock drainage pumping station.
Replacement of power cable with damaged and burnt out spare parts of motor starter panel and other allied works of pump unit no.2 at UDPS.
Repairing overhauling including replacement of defective spare parts of 2 nos. outgoing 400 amps OCB for pump unit no. 9 and 10 and Starter Panel of Pump unit no. 4 with other electrical works at UDPS.
Restoration, repairing with replacement of damage accessories of star- delta motor starter panel of pump unit 1 at Topsia Point A drainage pumping Station.
Thorough repairing, overhauling including replacement of defective spare parts of 1 no. incomer and 2 nos. outgoing H.T. VCB (6 KV / 800 amp) for point 2 at Dhapa lock drainage Pumping Station.