Loading…
Loading…
630 results • Recent activity
REMOVAL OF SILT and FOREIGN MATERIALS FROM NIKASHI DRAIN ALONG BOTH FLANK IN BETWEEN STRETCH FROM XING OF TARATALA TO XING OF T.G ROAD IN WARD NO.80 UNDER BR. IX
URGENT REPLACEMENT OF DAMAGED AND DEFECTIVE COMPONENTS OF 415V, 200 KW, S/D STARTER PANEL NO-4 AT DEEPER SUMP-1 UNDER BDPS.
URGENT REPLACEMENT OF DAMAGED AND DEFECTIVE COMPONENTS OF 415V, 200 KW, S/D STARTER PANEL NO-2 AT DEEPER SUMP-1 UNDER BDPS.
REPAIRING, SERVICING, MAINTENANCE AND COMPLETE TESTING OF MAIN INCOMING VCBs AT POINT - A (5-PANEL) AND POINT- B (1-PANEL) OF BIECCO MAKE 6KV, 800A HT VCB WITH OTHER ALLIED WORKS AT MAIN SUBSTATION UNDER BDPS.
Repairing of the damaged power cable including servicing and overhauling of 35 Cusec SWF submersible pump unit no. 2 along with allied works at Joka DPS under GRBU.
Thorough repairing of outside penstock gate in the main incoming channel with replacement of essential worn-out components at Baishnabghata Patuli Drainage Pumping Station