Loading
Loading…
Loading…
Found 1 active tenders
1 results • Latest
Development of pedestrian path from gufa parking toTemple (R.D. at 0/10 to 0/60 for Temple Trust SNDJI Distt. - Bilaspur (H.P.)
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within all metres leads and lifts as per direction and best satisfaction of Engineer - in- charge.(a) All kinds of soil