Loading…
Loading…
102 results • Recent activity
Painting, of Toilets and baths along Pahalgam Axis .
Upgradation / Repairs and Augmentation of main Sewerlines (Toilet Sewer line and langar Disposal line) by way of providing and laying of Pipes 200 mm ,150mm and 100 mm Dia with construction of Regular manholes at Nunwan Camp.
Minor Repairs to Existing Pacca Toilets 6 Blocks comparising of 64 toilets units and existing prefab toilets and Baths 311 nos with repair its sewage disposal line and sanitary items including Europeon type arrangement Complete at Nunwan Base Camp.
Departure Lounge, temporary rooms including fitting and repairs to G.I chain link fencing at Neelgrath (6 rooms) , Huts for Camp Director / Medical / Newly constructed PUF Huts at Baltal(10 Nos.).
Repair to Outsourced Huts at Baltal (33-64).
Construction of new rooms for staff at Baltal .