Loading…
Loading…
92 results • Recent activity
Operation and Maintanance Work for the Trihana P.W.S.S at Naxalbari block under Siliguri Division P.H.E.Dte. for the Period of 365 Days
Operation and Maintanance Work for Naxalbari Zone-I AND II PWSS at Naxalbari Block under Siliguri Division P.H.E.Dte. for the Period of 365 Days
Shifting of max 600 mm dia lower of CI and DI Pipes and specials from WTP Gate No. 3 to back side of exixting WTP for construction of proposed 83.59 MLD capacity WTP of Siliguri Municipal Corporation under Siliguri W/S Division, PHE Dte.( Part-B)
Shifting of 900 mm dia CI DI Pipes and specials from WTP Gate No. 3 to back side of exixting WTP for construction of proposed 83.59 MLD capacity WTP of Siliguri Municipal Corporation under Siliguri W/S Division, PHE Dte.(Part-A)
Repairing of roof of the office room of Fulbari Store, clearing premises, rearranging stacks of D.I and A.C pipes of various diameters etc. at Fulbari Divisional Store under Siliguri Water Supply Division, P.H.E Dte.
Supplying, fabrication, erection on suitable RCC foundation and commissioning with 3 months trial run of pressure type Iron Removal Plant with blower cum compressor room of internal size 3.6 M X 3.00 M and platform of size 9.00 m X 4.50 m at Kamala