Loading…
Loading…
222 results • Recent activity
KSP INDUSTRIES C3525E Solar Power Plant (Roof Top) for ONGRID, KSP INDUSTRIES C3525E Solar Power Plant (Roof Top) for ONGRID System, Single Phase 6 kw power with voltage 240 V
Unbranded High Mast Lighting Octagonal Tower with Solar Based LED, Unbranded High Mast Lighting Octagonal Tower with Solar Based LED Street Light, 7 meter Octagonal Pole with 3 Solar LED Street Lights
E-cart for Goods (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/7049941 Dated : 27-12-2025 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Past Performance 50 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Greenage Model III Lithium Ferro phosphate battery (for Model III &, Greenage Model III Lithium Ferro phosphate battery (for Model III & IV) 160 Wh for Model III
Unbranded Drinking Water ATM Reverse Osmosis (RO) 500