Loading…
Loading…
1,163 results • Recent activity
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Basanti W/S Scheme (Zone-I) , Block - Basanti under Canning Sub-Division, PHE Dte.(PH No. -III)
Construction of switch room cum chlorine room (5.4m x 3.6m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Basanti W/S Scheme (Zone-I), Block - Basanti under Canning Sub-Division, PHE Dte.(PH No. -I)
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Amtali W/S Scheme (Zone-II), Block - Gosaba under Canning Sub-Division, PHE Dte.
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Amtali W/S Scheme (Zone-I), Block - Gosaba under Canning Sub-Division, PHE Dte.
Engagement of Valve Operator cum cycle messenger with O and M of distribution pipeline including FHTC and Rising main within Zone-X of Diamond Harbour-I Block under Mega Surface Water Based Water Supply Scheme of Falta-Mathurapur. S24Pgs.(for 1year)
Engagement of Valve Operator cum cycle messenger with O and M of distribution pipeline including OHR, Pump house, FHTC, Rising main of Head work site in Zone-VII of Diamond Harbour-I Block under Mega Surface W/S Scheme of Falta-Mathurapur (for 1year)