Loading…
Loading…
1,111 results • Recent activity
Construction of 1(One) no. Boundary Wall at OHR site for Deulpur Gangadharpur (Zone - II) PWSS at Panchla Block of Howrah District under Howrah Sadar Sub-Division of Howrah Division, P. H. E. Dte.
Construction of 1(One) no. Boundary Wall at OHR site for Deulpur Gangadharpur (Zone -I) PWSS at Panchla Block of Howrah District under Howrah Sadar Sub-Division of Howrah Division, P.H.E.Dte.
Emergency Restoration of CI/DI Pipeline along with damaged main road due to laying of pipe line from Panchanantala to Taruner Ahaban Club Road Radharani Laha Memorial School to bisalaxmitala Road of Domjur (Zone-4) Dakshin Jhapardaha (Zone-I) PWSS
Sinking 1 no 250 X 150mm dia and 240 m deep tube well drilling by direct rotary method with 150mm dia PVC strainer of 30m length having 250mm dia60m long PVC housing pipe 150mm dia 150m long well pipe along with 3m blank pipe all Islampur PWSS.
Suppling fabrication of 600mm dia 10mm thick MS casing pipe and pushing of casing pipe by Hydraulic Jack pushing method to Cross Water carrier Pipe Between Node Point 65 to 427 of LDS drawing between station BARGACHIA DAKSHINBARI WL-34 Bargachia.
Supplying fabrication of 600mm dia 10mm thick MS casing pipe and pushing of casing pipe by Hydraulic Jack pushing method to Cross Water carrier Pipe Between Node Point 13 to 23 of LDS drawing between Patihal Bargachia Station at KM WL-57 Bargachia.