Loading…
Loading…
1,160 results • Recent activity
Construction of switch room SLOPE ROOF (3.60m x 3.00 m) with water supply sanitary arrangement of Sherpur PWSS (4th Tube well) of Amta-I Block under Uluberia Sub-Division under Howrah Division, P.H.E. Dte.
Construction of switch room SLOPE ROOF (3.60m x 3.00 m) with water supply sanitary arrangement of Chandrapur PWSS (4th Tube well) of Amta-I Block under Uluberia Sub-Division under Howrah Division, P.H.E. Dte.
Construction of switch room SLOPE ROOF (3.60m x 3.00 m) with water supply sanitary arrangement of Chandrapur PWSS (3rd Tube well) of Amta-I Block under Uluberia Sub-Division under Howrah Division, P.H.E. Dte.
Construction of 2.50 mtrs. Height Boundary Wall with double column after 15 mtrs interval along with 750 mm Height 4 layer barbed wire fencing around 2nd. TW site including with land development approach road of Kamina adjacent to Tulshiberia PWSS
Construction of switch room SLOPE ROOF (3.60m x 3.00 m) with water supply sanitary arrangement of Bamunhati PWSS (2nd Tube well) of Uluberia-II Block under Uluberia Sub-Division under Howrah Division, P.H.E. Dte.
Construction of Kiosk room at 5th TW site with interconnection of rising main with distribution pipeline at 3rd and 5th T.well of Dakhin Durgapur PWSS and interconnection work at Head work site of Bhagabanpur PWSS of Shyampur-I Block under Uluberia.