Loading…
Loading…
1,124 results • Recent activity
Engagement of Valve Operator cum cycle messengers with O and M of distribution pipeline including OHR, Pump houses, FHTC and Rising main pipeline within Zone-I, II, V, VI of Falta Block under Mega Surface W/S Scheme of Falta-Mathurapur, South 24 Pgs.
Sinking of 200mm x 150mm dia. 300 m. deep Tubewell by D.R. Rig Method using PVC pipe and pre-packed Resin Bonded Gravel Filter and Plumbing work at MCH Sub-Divisional Hospital (Matrima), Mouza- Dighirpar, GP-Dighirpar, Canning-I Block of Canning SD
Operation and maintenance of distribution system including rising main and FHTC for Dakshin Surendraganj Piped Water Supply Scheme of Pathar Pratima Block under Kakdwip Sub Division of Alipore Division, PHE Dte. (from 01.07.2025 to 30.06.2026)
Operation and maintenance of distribution system including rising main and FHTC for Kusumtala and Dwariknagar Piped Water Supply Scheme of Namkhana Block under Kakdwip Sub Division of Alipore Division, PHE Dte. (From 01.07.2025 to 30.06.2026)
Operation and maintenance of distribution system including rising main and FHTC for Hesamabad and Ramtanunagar Piped Water Supply Scheme of Kakdwip Block under Kakdwip Sub Division of Alipore Division, PHE Dte. (From 01.07.2025 to 30.06.2026)
Operation and maintenance of distribution system including rising main and FHTC for Taktipur Abad, Zone-I and Koaberia Piped Water Supply Scheme of Kakdwip Block under Kakdwip Sub Division of Alipore Division, PHE Dte. (From 01.07.2025 to 30.06.2026)