Loading…
Loading…
2,327 results • Recent activity
Transportation of safety material from surface to track end of all working districts (1-2 KM) of Bagdewa UG MIne.
Construction of 22 Nos. PCC ventilation stoppings in 3 Rise Panel proposed for depillaring in East Block of Churcha Mine RO.
Complete Tandem Drive Driven Drum Assembly for 1000mm Conveyor Belt 650mm 1150mm, Equalizing Gear in set of two Nos, Input Shaft Bearing Cover, Input Shaft Bearing Cap, Input Shaft Oil Seal, 1st Stage Gear and Pinion with Integral Shaft in Set 25, Input Pinion Shaft Bearing, 1st Intermediate Shaft Bearing, 2nd Stage Gear and Pinion with Integral Shaft in Set, Output Shaft Oil Seal, Fluid Coupling, Input Shaft Bearing Cover Spacing Washer, Input Shaft, 1st Stage Gear and Pinion in Set 25, 1st Intermediate Shaft Bearing Cover, Input Shaft Spacing Washer, 1st Intermediate Shaft, 2nd Stage Gear and Pinion in Set, 2nd Intermediate Shaft Bearing Cover, 2nd Intermediate Shaft Bearing, 2nd Intermediate Shaft, 2nd Intermediate Shaft Spacing Washer, Output Shaft Bearing, Output Shaft Spacing Washer, 3 Stage Helical Gear Box Complete, 1st Stage Gear and Pinion in Set With Integral Shaft 25, 1st Intermediate Shaft Spacing Washer, 2nd Intermediate shaft Bearing, Input Bearing Cover Spacing Washer, 1 st Stage Gear and Pinion in Set with Integral Shaft 25
Handling, Transport and Other Mining Services - Percentage quote based - Reclamation of compact coal by hydraulic excavator (JCB PC) and loading into tractor and transportation of coal stock yard to loading point area at Katkona siding of Katkona 1 a..
Custom Bid for Services - Dismantling and erection of OH line for diversion or extension of LT OH feeder from AC 4 feeder breaker to Weigh Bridge no 14 and drawing of running earth and providing and erection of guarding in OH lines at different locat.. Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations
LOTO KIT, Ladder FRP EXT Ended 12M F/Electrical use, Ladder 42FT AL Adjstbl, Hight Voltage Detector