Loading…
Loading…
2,331 results • Latest
Handling, Transport and Other Mining Services - Percentage quote based - Assistance required for transportation of materials from regional store to colliery store and Unit store to incline mouth at surface for Katkona Sub Area
Supply,Installation,testing and commissioning of 20Nos Early Streamer Emission (ESE) type of Lightning protection system along with earth pits and all required accessories for Lightning protection inside the mines premises at Dipka Expansion Project.
Re-conditioning of through cut steel cord belting (1600 mm wide) by longitudinal joint/patch with hot vulcanizing method at Silo Section of Dipka Expansion Project.
Nitrogen, Compressed Gas and Liquid conforming to IS 1747 (Q3)
Handling, Transport and Other Mining Services - Percentage quote based - Marching of 1 no of UDM from surface to 19 LE panel in Seam II of Katkona 1 AND 2 Incline
Refilling of Fire Extinguisher Cylinders - The Hydraulic Testing Repairing Refilling Spares replacement of ABC Type and DCP Type; 15 Nos of ABC Type having capacity of 10 KG and 32 Nos of DCP Type having capacity of 10 KG and 21 Nos of ABC Type havin..