Loading…
Loading…
10,268 results • Latest
Manual Metal Arc Welding Electrode Class M1.
Pinion Shaft 21 teeth for WAG 9
Set of Indication lamps for 3 phase locomotives as per CLW Specification No. CLW/ES/3/0072 Alt-I or latest. Set Consisting of 7 items as per attached Annexure.
AOH KIT FOR ANEST IWATA COMPRESSOR
Supply of Stainless Steel Toilet Door
Joint less Grooved Copper Contact wire
110 V, 40 AH Lead Acid Battery set
DEMU 1600 HP IV coupler as per Harting part no 84200000017133 Jumper Plug Type A1 + A2 assy
CIRCUIT BRAKER SCAVENGER BLOWER
Screw coupling assembly to DRG.No.RDSO SK.99001 Alt 4.
Spares Kit for Sander Control Valve
COPPER BEARING M.S. PLATE 10 MM
Supply of N2 BOARD FTRTIPL Part No. 1/600008A
Pneumaticimpactwrenches (Q3)
Ratchet Type Torque Wrench (Q3)
Sr. DEN/East/SBC Sec : SW I : ADEN/BWT Sec : Provision of Tactile tiling at Oorgaum (OGM), Tyakal (TCL), Marikuppam (MKM), Champion (CHU), Bisanattam (BSM), Chintamani (CMY), Gudupalli (GDP), Kolar (KQZ), Mulanur (MAR), Patchur (PU), Somanayakkanpatti (SKPT), Srinivasapur (SVS), Kamasamudram (KSM), BEML Nagar (BEML), Byatrayanhalli (BFW), Thudiyalur (THUD) under ADEN/Bangarpet sub-division. SW II : ADEN/SBC sec : Provision of tactile flooring at Devangonthi (DKN) station under ADEN/SBC sub-division. SW III : SBC-JTJ Sec : Proposed improvements to road surface of Level crossing gates No. 129 and 130 in ADEN/SBC sub-division. Maintenance period is 6 months.
DEN/South/SBC sec : Hosur : Proposed construction of Running room at Hosur (20 Beds) under ADEN/Dharmapuri Sub-Division. Maintenance period is 3 years
DEN/South/SBC sec : Dharmapuri : Proposed Construction of Running room at Dharmapuri (30 Beds) under ADEN/Dharmapuri Sub-Division. Maintenance period is 3 years.
Liquid Soap Dispenser (V2) (Q3)
ETHINYL ESTRADIOL 0.03 MG+ DROSPIRENONE 3 MG TAB/CAP
FLUPENTIXOL 0.5 MG, MELITRACEN 10 MG ORAL TABLET
PL NO.18300388-Resistor REGRT-190-50W to EMD PT NO.9519539
Hexagonal Headed Screw M24 X 100
Hexagonal Headed Bolt to Size M24 X 200