Loading…
Loading…
10,322 results • Latest
Supply, Installation and Commissioning of Fume Hood
MS 478 SILICON ELASTOMER COATED FIBRE G [MS 478 SILICON ELASTOMER COATED FIBRE GLASS SLEEVE
OXCARBAZEPINE 300MG PLAIN/SR/ER/MR TAB/CAP
Single Inlet Radial Blower 415V, 3 phase, 50HZ, 185W, 1045 cubic metre per hour discharge for exhausting air from pantry to RCF Specn. EDTS-331, Cor-3, Annexure-A, Type-II.
BATTERY AMMETER TO CAT NO. A700 DM
Snack Table Assembly for LHB AC-3 Tire Economy Coaches
Supply of Power/batterypack for Motorola make for 5 watts walkietalkie
Vande Bharat - complete pantograph assembly
3/4 INCH X 450MM HOSE CONNECTION
1-INCH HDPE PIPE HAVING 32 MM OUTSIDE DIAMETER
Argo-Shield Gas Cylinder Adaptor Nut.
S S Hex Hose Nipple, Size:25 X 25 X Length 70mm. one side threaded and another one side tapered Material AISI-304. NOTE: OEM / OEM of authorized Dealers should be supplying the item with Warranty/Guarantee Certificate.
SET OF CAB ILLUMINATION PUSH BUTTON
Supply of BC-AR Dual pressure gauge
Inverter for Railway Signalling installation 24V DC/110V AC/500VA
Acrylic oval shaped soap dish single
4 Inch single pressure gauge
RED COLOUR TAMPER CHECK PASTE (30 ML) Specification: TIP SIZE 2.9 MM MARKING. Extended Nozzle with variable points of 1mm to 2mm. Tamper proof Torque mark. Safe for most surfaces. Highly visible-red, colour is fluorescent under black light. Excellent Adhesion. Visually detects loose nuts and bolts. provide warranty protection. Meets BOEING Specification, BMS8-45 Type II. Make: CENTURYS OR DYKEM OR DALO MARKER OR CROSS CHECK or Equivalent
Double acting hydraulic shock absorber.
REGULATING EQUIPMENT (ATD) 3 PULLEY TYPE WITH MODIFIED PULLEY GROOVED (3:1 RATIO)WITH USE OF NBC BALL BEARING 6305 LLU(PART-I) OR SKF BALL BEARING 6305-2 RSI(PART-I) OR FAG BALL BEARING 6305-2 RSR(PART- II) IN REGULATING EQUIPMENT. AS PER RDSO SPECIFICATION NO.TI/SPC/OHE/ATD/0060 REV.-1 WITH A&C SLIP NO.1. DRG.NO.- TI/DRG/OHE/ATD/RDSO/00001/99/2, TI-SPC-OHE-ATD-TDSO-00001-99-3 OR LATEST.
Kit of Brake Gear Bushes for bogie mounted brake cylinder air brake coaches.
Supply of Power Cable 3 core 2.5 sq mm.
PVC Insulated Cable For Submersible Pumps ISI Marked To IS 694 (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
Subwork-1: Alteration to the existing Electronic Interlocking System (KYOSAN make) in connection with Tower Wagon siding work along with POINT FCOR circuit at SHEDBAL station. Subwork-2: Alteration to the existing Electronic Interlocking System (MEDHA make) in connection with the closure of LC gate at LC Gate No. 79 at MRD Yard; LC Gate No.18 at NGR Stations; LC Gate No. 85 at HPT Jn Station; LC Gate No. 331 at TVG Stations; and LC Gate No. 26 at LKT Yard also includes circuit alteration for NDKR/RDKR Circuit, POINT FCOR circuit and any other minor alteration required to be carried out as per railway requirement. Subwork-3: Alteration to the existing Electronic Interlocking System (SIEMENS make) in connection with the closure of LC Gate, at LC Gate No. 34 at BDM yard and LC Gate No. 41 at GED yard also includes circuit alteration for NDKR/RDKR Circuit, POINT FCOR circuit and any other minor alteration required to be carried out as per railway requirement. Subwork-4: Closure of mid-section interlocked Engineering LC Gate No.1B between KHTI & LNBI Stations; LC Gate No.19 between MAO & CNR Stations and LC Gate No.35 between VC & HBI Stations, Traffic LC Gate No.111 between BYC & BAY Stations of Hubballi Division, South Western Railway.
Radial Drilling Machine (Q3)
1.Provision of shunting neck on Rd-4 for a length of 300m towards SLU end in JRU yard. 2. Construction new AC Loco Trip Shed at Chikkajajur (JRU) station 3. Shunting Neck of 750m towards DRU end by extending the existing siding on Road-4 at Birur (RRB) station.
Construction of Rest House for Track Machine staff and allied works at BVR, DRU and TTR.
MYS-Construction of First-floor Building at new OPD Block and Improvements to Circulating area including compound wall of Railway Hospital at Mysuru.
Replacement of convetional type block instrument SGE/FM with SSBPAC to enhance the reliability of the block instrument in RRB to JRU section & JRU-BBNH of MYS division (08 SECTION).
Upgradation of Kanivehalli and Bisalehalli halts on par with NSG-6 category in view of conversion into block station.
HAS-MAJN Section:- Elimination of LC No.102,103 & 104 between SBHR - KBPR station by construction of LOW cost ROBs
Hubballi Division: Supply of water can to Level crossing gates and gang units under ADEN/Central jurisdiction( Total 33 gang units and 38 LC gates ) for 24 months.
Hubballi Division:- Provision of Tactile Path in Stations Under Sr. DEN/East Jurisdiction. (Maintenance period-12 Months)
Supply and Installation of Sun Screen (sun visor)
PARACETAMOL 125 MG+PHENYLPHRINE 2.5 MG+CHLORPHENIRAMINE MALEATE 1 MG OF NOT LESS THAN 10 ml DROPS