Loading…
Loading…
536 results • Recent activity
Geographic Information System (GIS) Software (V3) (Q2) (3 (3 ))
45U Open Rack, 24 Port SM Fully Loaded LIU, OS2 Duplex SC-LC Fiber Patch Cord, Dismantling the existing 45U FDMS Rack, Routing of existing 96F, 24F, and 12F OF cables for termination in new 45U Open Rack with accessories, Installation of new 45U Open Rack with accessories, Installation of fully loaded LIUs in the 45U Open Rack with proper cable dressing and labelling, including necessary accessories, Termination or Splicing with detailed core-wise labelling in the LIUs., End-to-end testing using OTDR and light source, Populating OFC patch cords from the new 45U Open Rack to the existing Core, Distribution, and Access switches., Documentation of the completed work - soft copy and hard copy
Entry and Mid Level Desktop Computer (Q2) (3 (3 ))
Manpower Outsourcing Services - Minimum wage - Skilled; Graduate; Admin
Entry and Mid Level Desktop Computer (Q2) ( ( 3 3 ))