Loading…
Loading…
291 results • Recent activity
Kolkata Basanti Road (SH-3A) from 5.00 kmp to 8.00 kmp, from 16.00 kmp to 20.00 kmp, Emergent Repairing and Maintenance work in Patches with DBM and BC at different stretches under South 24 Parganas Highway Division in the District of South 24 Pgs.
Hiring of 01One no. Wooden Hull Luxury Launch with Crew and Operating Staff at Lot No. 8 of Kakdwip for ferrying to Sagar Island and vice-verse for inspection and visit of different sites under Kakdwip Highway Sub Division of DHHD
Basanti-Garan Bose-Gangamela Road from 6.00kmp to 11.00kmp (Except PHED damaged areas restored to be restored from PHE deposit fund) Emergent restoration in patches under South 24 Parganas Highway Division in the district of South 24 Parganas.
Kolkata Basanti Road Laying of Hume Pipe near Minakhan Bazar (36.00kmp to 36.35 km) to connect the existing drain to nearest channel under South 24 Parganas Highway Division in the district of North 24 Parganas.
Kolkata-Basanti road from 29.00 kmp to 42.00 kmp (except rigid pavement portions) Emergent patch repair work under South 24 Parganas Highway Division in the District of North 24 Parganas.
Basanti Highway (SH-3A) from Minakhan 132/33 KV Sub-Station (Ch.34.70km) to Malancha Bridge (Ch.40.90km) restoration of damaged by laying of 33KV UG Cable line by Basirhat Division, WBSEDCL under South 24 Parganas Highway Division.