Loading…
Loading…
120 results • Recent activity
high performance power supplies (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Label Printer/Barcode Printer (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
High End Desktop Computer (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7152598 Dated : 28-01-2026 Bid Document 1/11 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 40 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Accounts Officer Space Applications Centre, Department of Space, indian space research organization, Department of Space, Ahmedabad (Accounts Officer)
SCH 80 Union 15mm nb, UPVC SCH 80 Union 20mm nb, UPVC SCH 80 Union 25mm nb, UPVC SCH 80 Union 50mm nb, UPVC SCH 80 Union 63mm nb, UPVC SCH 80 Union 80mm nb, UPVC SCH 80 End CAP 40mm, UPVC SCH 80 End CAP 50mm, UPVC SCH 80 End CAP 80mm, CPVC SDR11 elbow 32mm, CPVC SDR11 elbow 40mm, CPVC SDR11 elbow 50mm, CPVC SDR11 elbow 80mm, CPVC SDR11 brass elbow 20mmx15mm, CPVC SDR11 45degree elbow 25mm, CPVC SDR11 45degree elbow 32mm, CPVC SDR11 45degree elbow 40mm, CPVC SDR11 45degree elbow 50mm, CPVC SDR11 Tee 32mm, CPVC SDR11 Tee 40mm, CPVC SDR11 Tee 50mm, CPVC SDR11 Reducing Tee 20mmx15mm, CPVC SDR11 Reducing Tee 25mmx20mm, CPVC SDR11 Reducing Tee 25mmx15mm, CPVC SDR11 Reducing Tee 32mmx25mm, CPVC SDR11 Reducing Tee 40mmx32mm, CPVC SDR11 Reducing Tee 50mmx40mm, CPVC SDR11 Coupler 32mm, CPVC SDR11 Coupler 40mm, CPVC SDR11 Coupler 50mm, CPVC SDR11 Coupler 80mm, CPVC SDR11 Reducer socket 40mmx32mm, CPVC SDR11 Reducer socket 50mmx40mm, CPVC SDR11 Reducer socket 50mmx32mm, CPVC SDR11 Reducer socket 80mmx50mm, CPVC SDR11 Union 20mm, CPVC SDR11 Union 32mm, CPVC SDR11 Union 40mm, CPVC SDR11 Union 50mm, CPVC SDR11 Union 80mm, CPVC SDR11 FTA 50mm, CPVC SDR11 FTA 80mm, CPVC SDR11 MTA 32mm, CPVC SDR11 MTA 80mm, Actuator Knob for chevron cistern, CPVC Solvent cement for CPVC pipes, PVC Floor trap with 75mm dia outlet, 5mm Thick mirror of size 450mmx600mm, 25mm PVC tank connection set, 32mm PVC tank connection set, 40mm PVC tank connection set, 50mm PVC tank connection set, Sintex tank cover for 500 litre sintex tank, Sintex tank cover for 1000 litre sintex tank, Sintex tank cover for 2000 litre sintex tank, Sintex tank cover for 5000 litre sintex tank, Pressmatic urinal valve auto closing system with builin control lock, Drill Bit for concrete, Polythene Float valve 25mm dia, Polythene Float valve 32mm dia, Polythene Float valve 40mm dia, Polythene Float valve 50mm dia, UPVC Valve 25mm dia, UPVC Valve 32mm dia, UPVC Valve 40mm dia, UPVC Valve 50mm dia, Flat chisel big, Hammer 750 gm, Sliding window roller bearing
Fixed Computer Workstation (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
File/Folder (V3) (Q4) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No