Loading…
Loading…
253 results • Recent activity
Custom Bid for Services - Preparation of Hydrogeological Report and Ground Water Clearance from CGWA Similar Category Survey or Market Research Services/Program evaluation or assessment survey services/Feedback Survey
Custom Bid for Services - Design Supply Installation and Commissioning of sensor based Wheel washing Truck tyre system at PBCMP Similar Category Design, Supply, Installation, Commissioning and Maintenance of Grid Connected Roof Top Solar Power Plant Service
Custom Bid for Services - EPC Package of Roof top Solar of capacity 135 KWp along with Battery Backup for Sikri Township Area of PBCMP Similar Category Design, Supply, Installation, Commissioning and Maintenance of Grid Connected Roof Top Solar Power Plant Service
Custom Bid for Services - Supply, transportation, installation including civil works, testing and Commissioning of Solar streetlight Similar Category Design, Supply, Installation, Commissioning and Maintenance of Grid Connected Roof Top Solar Power Plant Service
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2026/B/7082492 Dated : 09-01-2026 Bid Document 1/10 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Procurement of R Flex