Loading…
Loading…
2,655 results • Latest
Safes (V3) ISI Marked to IS 550 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7160491 Dated : 28-01-2026 Bid Document 1/6 Number of Auto Extension count 1 Past Performance 50 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
data wall display (Q2) (3 (3 ))
Note Sorting Machines (V2) (Q2) (3 (3 ))
Supply of Hi-Wall Split AC, 2.00 TR BEE 5-Star Inverter AC, Supply of Hi-Wall Split AC, 1.5 TR BEE 5-Star Inverter AC, Supply of Hi-Wall Split AC, 1.0 TR BEE 5-Star Inverter AC, Installation of 2.00 or 1.5 or 1.0 TR Hi-Wall Split AC, Supply and Installation of copper refrigerent pipes for 2.00 TR SACs, Supply and Installation of copper refrigerent pipes for 1.5 or 1.0 TR SACs, Supply and Installation of interconnecting wires for 2.00 TR Hi-wall Split Acs, Supply and Installation of interconnecting wires for 1.5 or 1.0 TR Hi-wall Split Acs, Supply and Installation of 25 mm PVC drain Pipes, Supply and Installation of MS Angle for Outdoor units, Supply and Installation of Drain Pump with water tank, Supply and Installation of 4KVA Stabliser, Supply and Installation of 5.0 KVA Stabliser
Custom Bid for Services - 1500000 Similar Category AMC of Integrated Security and Surveillance System
Safes (V3) ISI Marked to IS 550 (Q2) ( ( 3 3 )) OEM Average Turnover (Last 3 Years) 200 Lakh (s) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, OEM Authorization Certificate, OEM Annual Turnover, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2026/B/7119674 Dated : 17-01-2026 Bid Document 1/9, -- Number of days for which Bid would be auto -- extended 5 Number of Auto Extension count 3 Past Performance 50 % Bid to RA enabled No ITC available to buyer Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No