Loading…
Loading…
176 results • Latest
BRAKE BEAM LEAVER INNER & OUTER
BOGIE BOLSTER ARRANGEMENT
SET OF SS LAVATORY INLAYS (LSLRD)
Coach Set of Roof Assembly (VB Sleeper DTC)
C/S of Roof Assembly (LWACCW PP)
C/S of Roof Assembly (VB Sleeper NDTC)
DOOR CUT OUT (VB SLEEPER MC, TC, NDTC)
SECONDARY VERTICAL DAMPER FOR NON AC COACHES WITH FIAT BOGIE
Supply and Application of HPAC and JIS painting scheme as per drg No.32903046 Alt "nil" for FIAT Bogie Frame to drg no. 66703001 Col-I Alt"c" or 83403002 Col-I Alt"b" or 45503001 Col I Alt "k".
SUPPLY AND APPLICATION OF EPOXY BASED ELASTIFIED TOP COAT (TWO COMPONENTS)RALSHADE -7012 FOR PAINTING OF UNDER FRAME AND INTERIOR OF COACHES AS PER SPECIFICATION MDTS-094,REVISION-1,WITH AMENDMENT SLIP NO.1 OF NOV-2008. TEST PANEL FOR ACCELERATED TEST BE PREPARED BY APPLYING TWO COATS OF THIS PAINT. REFERENCE DRG FOR APPLICATION ON LHB AND TRAIN-18 COACHES ICF DRG NO.465-9-0-003 ALT 'C'.
Coach Set of End Wall (VB Sleeper DTC)
SS SHEET SUS 301L-DLT - DULL FINISH OF SIZE 2 mm X 1250/1500 mm X 2150 mm TO JIS G 4305 STANDARD.
HEX HEAD BOLT IS:1364 (PART 1)2002 -M16
S & I OF BODY SHELL ITEMS (LWLRRM)
Coach Set of End Wall (TS MC, NDTC & TC)
SET OF HEXAGONAL HEAD SCREW COMPLETE
COACH SET OF DETAILS OF FRAME WORK (TS MC)
AXLE BOX HOUSING (FINISH MACHINED)T02602
S & I OF LAVATORY INLAY (MEMU DMC JK & NDMC JK)
SS DRAIN PIPE DIA 38MM OD THICKNESS 2.3MM
Coach set of Lavatory Sidewall (LHB AC PP)
BRACKET FOR PARKING BRAKE FOR BOGIES WITH AIR SPRING.
BODY SIDE SLIDING DOOR (EMU & MEMU)
C/S of Roof Assembly, Final Roof Element & Roof End Part (LWFCWAC)
C/S LONGITUDINAL BEAM (CRF) (EMU TC SWAP)