Loading…
Loading…
108 results • Recent activity
Upkeeping of entire ROW of street scaped road of sample stretches at Aurobindo Marg (Approximately 500 meter length for LHS Side) excluding sweeping of main carriage way.
Upkeeping , Routine maintenance and Watch and Ward of entire ROW (Excluding main carriage way) i/c keeping the ROW encroachment free of Road no 41, From Metro Pillar No.358 to Metro Pillar No.386.)
Upkeeping, Routine maintenance and Watch and Ward of entire ROW (Excluding main carriage way) i/c keeping the ROW encroachment free of Road no 41, from NSP to Metro Pillar No.330)
Upkeeping of entire ROW (excluding main carriage way) of street scaped Ring Road from Subway to Rajputana Rifles Gate
Upkeeping of entire ROW (excluding main carriage way) of street scaped Ring Road from Nanakpura to near Dhaula Kuwan Subway.
Upkeeping of entire ROW (excluding main carriage way) of street scaped on Vikash Marg from Kar Kari Mor to Preet Vihar Red Light.