Loading
Loading…
Loading…
1 results • Latest
Construction of R.C.C Bridge along with its Approaches at Hanarbari over Hobgar Canal in Mouza-Kalinagar and Paschim Raghunathpur,G.P-Shahjadapur and Gordewani, Block Joynagar II under Bishnupur Sub- Division (1st call)
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, complete as per direction of the Engineer-in-Charge. By Mechanical means. ( a )All types of soil upto 3 m depth