Loading
Loading…
Loading…
4 results • Latest
Requirement of MIL make control valves (Boiler Gun corners) for Boiler unit 1 to 4, (4x250 MW) at CTPP, RVUNL, Chhabra
Requirement of spares of New Allenberry works make Speed reducer (gear box), type 1C Sr. no. CD 93/2 for APH (Boiler Mtc.) and type CSB 250 identical to DT-29, CSB 280 identical to DB-73 for CHP area unit 1 to 4 (4x250 MW) at CTPP Chhabra
Annual contract for providing cup lock metallic scaffolding inside and outside the Boiler during annual overhauling (Includes supply of material and installation and removal) of unit 1 to 4, CTPP, RVUNL, Chhabra
Annual contract for On line safety valve setting of unit 1 to 4 (4X250MW) CTPP,RRVUNL,CHHABRA