Loading…
Loading…
140 results • Recent activity
Jalgaon Indl.Area M and R to WSS Providing protective treatment to jackwell at sakegaon and the pump House at Ground level service Reservoir GSR Jalgaon and other allied works
M and R to Water Supply Scheme at Nashik Satpur Industrial Area.. Simulation study and analysis of Satpur grid, identification of problems in existing system and suggesting remedial measures for Nashik Water Supply Scheme. Rs.38,07,536.00
Ambad Indl. Area M and R to NRB Construction of septic tank in fire station building premises. Rs. 2067961.00
M and R to WSS at Mini Dindori Industrial Area.. Shifting of 150 mm dia. D.I. K-9 rising main pipeline from borewell at Palhed Dam to ESR at Mini Dindori Industrial Area. Rs. 3123537.00
M and R to water supply scheme at Sinner. Retrofit of damaged HT 11 KV VCB, Cable, Capacitors and other miscellaneous work at Palse Jackwell. Rs. 1998968.00
M and R to WSS Sinner .Upgradation of electromechanical equipment with allied works at Raw Water Works Palse .Rs. 3994416.00