From 0.000 K.M. to 2.500 K.M. Uprooting, strengthening of embankment As L-Sec and X-sec. and Old Brick on Edge Lining work with old and 40 percent New Brick Patch work in Pipra Minor Langari Pump Canal Basti
Old Brick on Edge Lining work at Main Canal with Old and 40 Percentage New Brick patch work As L-sec, X-Sec From 0.700 k.m. to 1.700 k.m and Uprooting, strengthening of embankment Langari Pump Canal Basti
Old Brick on Edge Lining work at Main Canal with 40 Percentage new and old Brick From 0.000 k.m. to 0.700 k.m 700 Mtr as L Sec and X Sec for up Lifting of bed and Uprooting, strengthening of embankment at Lanagri Pump Canal Basti
Uprooting and strengthening of embankment Brick on Edge Lining work with 100 percent New Brick As per L-sec. and X-Sec at Main Canal From 1.700 Km. to 2.500 Km.