Loading…
Loading…
8 results • Recent activity
1st class brick lining work in bed and both side wall in main canal with 100 new bricks chainage 0.380 km to 1.06 km at Akaradiya kala pump canal district Lucknow with all cost of material, labour, tool and plant etc as per drawing and BOQ.
1st class brick lining work in bed and both side wall with 100new bricks chainage 0.500 km to 0.700 km and chainage 0.950 km to 1.400 km at jijauliya pump canal in district Raibareli with all cost of material, labour, tool and plant etc as
1st class brick lining work with 100pc new brick and C.C 124 cm on bed from chainage 1.080 km to 1.400 km including all cost of material, labour, tool and plant etc. as per bill of quantity at Rudauli pump canal district Ayodhya
1st class brick lining work in bed and both side wall in main canal with 100pct. new bricks chainage 0.675 km to 1.00 km including all cost of material, labour, tool and plant etc. as per bill of quantity at Phagoopur pump canal district Raebareli
1st class brick lining work with 100pct. new brick from 1.30 km to 2.00 km, C.C on bed with glass strip from 1.30 km to 2.00 km and cement plaster on both side of wall at Adaura pump canal in district Barabanki.
River bank protection work including all cost of material, labour, tool and plant etc. as per bill of quantity at Adaura pump canal district Barabanki.