Loading…
Loading…
5,561 results • Latest
TTPS Operation Circle CAD CWPH I Unit II Annual Overhauling of internal and external assembly and Reconditioning of C.W.P Internal spares 2A, 2B and 2C of Unit II
TTPS Operation Circle CAD ACWPH Unit II A.C.W System Annual overhauling of valves, strainers and NRV s of A.C.W pumps and inlet and Outlet valves of Cooling Tower
TTPS Operation Circle CAD CWPH I Unit II Annual overhauling of TW screen 2A to 2D complete silt removal from pump suction end to TW screen channel entry gate for the year 2025 to 2026
TTPS Operation Circle CAD Unit II CW pump 6.6KV, 500 KW Jyothi make CW Pump Motor Top Bearing Oil and Water Chamber and side Air Cooler Pipes cleaning, and complete cleaning of Converging and Diverging type Fan and Fan cover by using Soap Oil and Pai
Clearing of floating debris accumulated at trash rack (grids of panel) and nearby barrage gates, intake pool at water level such as Hyacinth, grass, thorns, weeds, logs, dead animals etc., and disposing the collected debris and cleaning the Mechani
TTPS Operation Circle MPM I Unit II Reconditioning of hot air gate pneumatic cylinders and inspection, overhauling and commissioning of actuators for both manual and electrical operation in hot air dampers during the forthcoming overhaul